Content Trust
Formexi Editorial and Technical Review Policy
Formexi technical content should answer a defined buyer question, state conditions and limitations, use verifiable sources or first-hand manufacturing evidence, and receive review from a person qualified for the topic. Search traffic is not a reason to publish unsupported capabilities or duplicate pages.

Who Creates the Content
Every public technical page should identify a named author, current role and relevant experience. Pages with engineering, quality or material decisions should also name a technical reviewer.

How Information Is Produced
- Define buyer intent and page boundary.
- Collect drawings, process records, tests, photographs or authoritative sources.
- Draft the direct answer with conditions and failure boundaries.
- Verify company capability and remove unsupported claims.
- Complete technical and editorial review.
- Record publication and update dates.
Use of AI
AI may support organization, editing and coverage checks, but it must not invent projects, people, equipment, certification, measurements or sources. A qualified person remains responsible for fact verification and publication.
Corrections and Updates
Correct factual errors promptly, record material updates, and review pages when standards, capabilities or company information change. Contact details for reporting an error should be published after the responsible mailbox is confirmed.
Commercial Transparency
Company service pages represent Formexi’s commercial interests. Technical comparisons should disclose capability boundaries and avoid presenting one process as universally superior.

Apply Formexi Editorial and Technical Review Policy to the Buyer Decision
For Formexi Editorial and Technical Review Policy, use the controlling 2D drawing and 3D model to define part number and revision, material and condition, quantity and annual demand, critical tolerances and GD&T, roughness, heat treatment, surface finish, inspection documents, packaging, delivery address and target date. Identify confidentiality restrictions and which DFM changes may be considered for this part.
Price and lead time can be confirmed only after geometry, material availability, programming, workholding, external processes, inspection effort, first-article approval and logistics are reviewed together.
Check the complete RFQ inputs before supplier comparison.
Prepare a Part-Specific Manufacturing Review
For Formexi Editorial and Technical Review Policy, send the controlled 2D drawing, 3D model, material and condition, quantity, critical tolerances, GD&T, surface requirements, quality documents, target date and acceptable DFM scope. We will identify open assumptions before price or production is confirmed.